East Hampton
Board of Education
East Hampton, CT 06424
MINUTES: February 24, 2009
1. The Facilities Workshop was called to order by Chairperson, Mr. Vasquenza at
5:30 pm in the East Hampton High School Library/Media Center.
Members present: Mr. Vasquenza, Mr. Hurst, Mr. Laraia, Mr. Coolican,
Ms. Barmasse, Ms. Wall, Ms. Robinson and Mr. Gemma
Members absent: Ms. Pessoni
Administration present: Dr. Golden, Superintendent of Schools
Mr. Reich, Assistant Superintendent of Schools
.
Others Present: Mr. Sorano, Friar Associates, Inc
2. Mr. Sorano representing Friar Associates, Inc. reviewed the five (5) scenarios for renovating the East Hampton High School. Four (4) of the five scenarios also
included an addition to the existing facility. After a lengthy discussion, it was the
consensus of the Board of Education to consider scenario two at the next Board of Education meeting on March 9, 2009. This scenario included a new athletic addition, renovating the existing athletic addition into a science classrooms, upgrading computer wiring throughout the existing building, minor renovations
to meet safety health and handicapped codes, installation of a sprinkler system and the renovation of the 40’s and 50’s wings.
Mr. Sorano also reviewed the construction of a new Center Elementary School on the Memorial Elementary School site. It was the consensus of the Board of
Education to consider this project at the next Board of Education meeting on March 9, 2009.
3. Adjournment
3.1 Motion by Ms. Robinson, seconded by Ms. Barmasse to adjourn the meeting at 7:14pm. Voted unanimously.
Respectfully submitted,
Joanne Barmasse
Secretary
|