Skip Navigation
This table is used for column layout.
05-08-13 PLANNING AND ZONING COMMISSION DESIGN REVIEW AGENDA
Town Council Chambers                                                                                                                             
Begins: 5:00 p.m.                                                                                                            May 3, 2013
DESIGN REVIEW AGENDA
PLANNING AND ZONING COMMISSION
MAY 8, 2013
1.  CALL TO ORDER

2.  SITE LOCATION APPROVAL – 326 Tolland Street under C.G.S.
     Section 14-54 for a general repairs license ownership change.
     Assessor’s Map #37   Lots # 5& 6
    Applicant: Carlos C. Gray

3.  SITE PLAN APPLICATION – 446 Main Street A.K.A Willow Arms Apartments, Installation of an       
     electrical generator and concrete pad to an existing multi-family facility.
    Applicant: Chris Atiyeh

4.  SITE PLAN APPLICATION – 2 Edgewood Street A.K.A “Wickham Hill Water Storage Basin    
     facility”, Addition to an existing water recirculation building, miscellaneous electrical equipment    
     upgrades, installation of a membrane liner over each water basin roofs and miscellaneous pipe    
     upgrades.
    Applicant: The Metropolitan District, Ms. Beth Nesteriak

5.  SOIL EROSION AND SEDIMENTATION CONTROL APPLICATION – 2 Edgewood Street       
     A.K.A “Wickham Hill Water Storage Basin facility”, Addition to an existing water recirculation    
     building, miscellaneous electrical equipment upgrades, installation of a membrane liner over each    
     water basin roofs and miscellaneous pipe upgrades.
    Applicant: The Metropolitan District, Ms. Beth Nesteriak

6.  REVIEW OF CORRESPONDENCE

  • Memorandum from Mr. Gary Zalucki; Assistant Zoning Enforcement Official dated April 30, 2013 regarding signs on Town properties.
7.  DISCUSSION REGARDING REQUIRED ZONING REGULATION REVISIONS  
     FOR  “Financial Guarantee Requirements”.

8.  DISCUSSION REGARDING SECTION 214.1 “ACCESSORY STRUCTURES AND USES IN    
     RESIDENCE ZONE SUBSECTION (G) Major recreation equipment storage requirements.

9.   APPROVAL OF MINUTES
  • Design Review Minutes – April 10, 2013
  • Regular Session Minutes – April 10, 2013
10. MISCELLANEOUS

11.  ADJOURNMENT