Skip Navigation
This table is used for column layout.
06-27-07 Design Review Agenda
Town Council Chambers
Begins:  7:00 p.m.                      


DESIGN REVIEW AGENDA
PLANNING AND ZONING COMMISSION
JUNE 27, 2007


1.      CALL TO ORDER

2.      SITE PLAN APPLICATION – 400 Main Street, Installation of a new electrical substation to an existing industrial manufacturing facility adjacent to the Pratt & Whitney Engineering Building.
Applicant: Edwin C. Rimpley, MACTEC Engineering & Consulting

3.      SITE PLAN APPLICATION – 400 Main Street, a.k.a. Pratt & Whitney Building G, Installation of new windows, metal siding and construction of a new entrance to an existing industrial manufacturing facility.
Applicant: Donald P. Crowe AIA- The S/L/A/M Collaborative

4.      SITE PLAN APPLICATION – 417 School Street, Installation of a chain link fence, underground propane tank and parking lot expansion, and associated storm water drainage to an existing industrial building.
Applicant: Zuvic Associates

5.      SITE PLAN APPLICATION – 186 Brewer Street, Construction of a 5,670 square foot boat maintenance facility, parking lot and associated storm water drainage.
Applicant: Cabela’s Retail, Inc.

6.      SOIL-EROSION AND SEDIMENTATION CONTROL APPLICATION:  186 Brewer Street, Construction of a 5,670 square foot boat maintenance facility, parking lot and associated storm water drainage
Applicant:  Cabela's Retail, Inc.

7.      ADJOURNMENT