Town Council Chambers
Begins: 7:30 P.M
REGULAR SESSION AGENDA
PLANNING AND ZONING COMMISSION
DECEMBER 12, 2012
1. CALL TO ORDER
2. APPROVAL OF MINUTES
- Regular Session Minutes – November 14, 2012
3. APPLICATION FOR MAJOR FLOOD HAZARD DEVELOPMENT PERMIT-Under
section 601 to allow pipe investigations and potential repairs to an existing underground
petroleum pipeline located on land in Great River Park.
Assessor Map# 1 Lot# 2
Applicant: Buckeye Partners, L.P
4. APPLICATION FOR MAJOR FLOOD HAZARD DEVELOPMENT
PERMIT-Under section 601 to allow pipe investigations and potential repairs to
an existing underground petroleum pipeline located on land in Colt Street Right of
Way.
Applicant: Buckeye Partners, L.P
5. APPLICATION FOR MAJOR FLOOD HAZARD DEVELOPMENT
PERMIT-Under section 601 to allow pipe investigations and potential repairs to
an existing underground petroleum pipeline located on land west of Jencks Street,
between the CT River and East Hartford levee.
Assessor Map# 15 Lot# 1
Applicant: Buckeye Partners, L.P.
6. SPECIAL PERMIT APPLICATION-Under section 207.10 to allow construction of a
nature trail/walkway on land owned by the Town of East Hartford located at the terminus of
Phase II at Hillside Street, Along the Hockanum River Corridor toward the historic mill near
the end of Cottage Street connecting back onto Olde Roberts Street.
Assessor's Map # 36 & 47 Lot # 18A &148
Applicant: Town of East Hartford
7. APPLICATION FOR MAJOR FLOOD HAZARD DEVELOPMENT
PERMIT -Under section 601 to allow construction of a nature trail/walkway on
land owned by the Town of East Hartford located at the terminus of Phase II at
Hillside Street, Along the Hockanum River Corridor toward the historic mill near
the end of Cottage Street connecting back onto Olde Roberts Street.
Assessor's Map #36 & 47 Lot # 18A & 148
Applicant: Town of East Hartford
8. SITE PLAN APPLICATION- To allow construction of a nature trail/walkway on
land owned by the Town of East Hartford located at the terminus of Phase II at
Hillside Street, Along the Hockanum River Corridor toward the historic mill near
the end of Cottage Street connecting back onto Olde Roberts Street.
Assessor's Map #36 & 47 Lot # 18A & 148
Applicant: Town of East Hartford
9. SOIL EROSION AND SEDIMENTATION CONTROL APPLICATION - To allow
construction of a nature trail/walkway on land owned by the Town of East Hartford located at
the terminus of Phase II at Hillside Street, Along the Hockanum River Corridor toward the
historic mill near the end of Cottage Street connecting back onto Olde Roberts Street.
Assessor's Map #36 & 47 Lot # 18A & 148
Applicant: Town of East Hartford
10. SITE PLAN APPLICATION– 451 Main Street, construction of a 3,500 square foot addition
to an existing bottling works facility.
Applicant: Coca-Cola Refreshments, USA, Inc. – Rade Cavic, Project Manager
11. SOIL EROSION AND SEDIMENTATION CONTROL
APPLICATION:~Under section 217 to allow 2013 Roadway Improvement Project consisting of roadway mill & overlay and pavement reclamation.
Applicant: Town of East Hartford Public Works Department, Timothy Bockus,
Director
12. REVIEW OF CORRESPONDENCE
- Letter from Attorney David S. Hoopes dated December 6, 2012 regarding 800 Connecticut Boulevard.
13. REVIEW/ RECOMMENDATION FOR TOWN PLANNING AND ZONING
COMMISSION’S BUDGET FOR FISCAL YEAR 2013-2014
14. MISCELLANEOUS
15. ADJOURNMENT
|