Town of Chilmark |
Zoning Board of Appeals |
|
Meeting Agenda |
|
|
Meeting Title |
|
Start Time |
4:00 PM |
Results Desired |
|
Stop Time |
5:00 PM |
Date |
May 22, 2019
|
Place |
Chilmark Town Hall |
|
|
|
PERSONS ATTENDING |
|
1 |
Wendy Weldon |
2 |
Russell Maloney - Chairman |
3 |
Allison Burger |
4 |
Frank LoRusso – Vice Chairman |
5 |
Chris Murphy |
6 |
|
7 |
|
8 |
Joan Malkin - Alternate |
9 |
Chuck Hodgkinson – Admin. |
10 |
Joe Chapman - Alternate |
|
|
|
|
|
|
Meeting |
|
1 |
4:05 PM: BRAD GANDRUP; Article 6 Section 6.6; 16 Valley Lane; Map 3 Lot 50: Install an auxiliary generator in a location that does not meet the minimum 50-foot setback distance from the lot lines. The generator will be approximately 11 feet from the southwest lot line and 17 feet from the southeast lot line. |
2 |
4:10 PM: MOIRA FITZGERALD FOR TOM AND HELEN PORTER; Article 6 Section 6.3; 82 Menemsha Crossroad; Map 26 Lot 34: Renovate and expand a pre-existing, non-conforming structure on a non-conforming lot. The existing non-conforming roof ridge height of approximately 18’ 10” will be increased to approximately 20’ 9” above mean, natural grade. The Site Review Committee deemed the architectural features as being
consistent with the Captain Flanders House, cape design. The project is in the Menemsha Crossroad Roadside District. |
3 |
4:20 PM: JOSH BAKER FOR SPENCER THURLOW; Article 11 Section 11.6B.2.a. and Article 8 Section 8.3; 25 State Road; Map 30 Lot 79.3: Remove a pre-existing, non-conforming 1-bedroom, 1,022 sq. ft. dwelling and replace it with a 1,167 sq. ft. dwelling on a 3-acre lot. The new dwelling will be 32 feet from the east lot line with a roof ridge height of less than 18 feet above grade. An existing 60 sq. ft. shed will be replaced with a 100 sq. ft. shed located 11 feet from the east lot line.
The project is in the State Road Roadside District. |
4 |
4:30 PM: GEORGE SOURATI FOR BEETLEBUNG ROAD, LLC; Article 4 Section 4.2A3; 33 Beetlebung Road; Map 20 Lots 34, 35: Replace an existing built-in swimming pool with a 20’ X 44’ built-in swimming pool and surrounding deck. A separate 14’ X 82’ built-in lap swimming pool will also be constructed and all structures will be on a total of 3.88-acres. Both pools will be heating with air-source heat pumps. The
pool equipment for both pools will be located in an underground vault. A four-foot high pool enclosure will be placed around both pools and use one wall of an existing garage as part of the enclosure. The power from the pool equipment will be offset with 28 solar panels mounted on the garage roof. |
5 |
ADMINISTRATION: April 24, 2019 meeting minutes. Next Meeting: Wed., June 26, 2019 @ 4:00 PM
|
|