Skip Navigation
Click to return to website
This table is used for column layout.
Zoning Board of Appeals Agenda 09/27/17
   Town of Chilmark
  Zoning Board of Appeals
 Meeting Agenda
  Meeting Title
Start Time
5:00 PM
  Results Desired
Stop Time
6:00 PM
  Date
September 27, 2017

Place
Chilmark Town Hall

   PERSONS ATTENDING
1
Allison Burger  
2
Russell Maloney
3
Wendy Weldon – Vice Chairman
4
Frank LoRusso
5
Chris Murphy – Chairman
6
Allen Healy, Alternate
7
Todd Christy, Alternate
8
9
Chuck Hodgkinson – Admin.
10

                                                                          Meeting
1
5:00 PM:  Discuss proposed amendment to the pool bylaw – Article 4 Section 4.2A3.
2
5:05 PM:  BRUCE MACNELLY FOR NOCKET DOWNS NOMINEE TRUST; Article 8 Section 8.3; 19 Lake Road; Map 35 Lot 3.2:   Alter a pre-existing, non-conforming dwelling by adding an approximate 165 sq. ft. kitchen extension and an approximate 175 sq. ft. entry/bath extension.  The additions will not increase the non-conformity of the structure.  The kitchen extension roof line will match that of the non-conforming roof line of the studio wing.  The entry/bath roof will match the conforming roof of the main body of the existing house.  The project is in the Squibnocket Pond District.
3
5:15 PM:  REID SILVA FOR WARREN SPECTOR; Article 4 Section 4.2A3;                                        96 Squibnocket Farm Rd.; Map 37 Lot 4:  Construct a 17 ft. X 51 ft. built-in swimming pool with the required pool enclosure and related pool equipment.  The pool water will be heating by an air-source heat pump.  The renewable energy will be supplied by the Eversource Verde Energy Program.  The pool equipment will be located in an underground vault.  The project is in the Squibnocket Pond District.
4
5:25 PM:  TOM CARBERRY FOR RICHARD AND ELLEN MUGLIA; Article 6 Section 6.3;           off Wades Field Rd.; Map 17 Lot 38.  Construct an unconditioned (no insulation or heat) storage building with a roof ridge height of 27’ 10” above mean natural grade.  The proposed building is replicating the main barn on 451 South Road.  This structure will have electric service and no inside water service.  The project is in the South Road Roadside District.
5
6
ADMINISTRATION:  August 23, 2017 meeting minutes.
                                       Next Meeting:  October 25, 2017 (Review hunting plans)