Skip Navigation
Click to return to website
This table is used for column layout.
Conservation Commission Revised Agenda 04/03/19
CONSERVATION COMMISSION REVISED AGENDA 4/3/19 @ 12:30 PM
No Site Visit


  • 12:30 PM:  REQUEST TO POSTPONE THE HEARING TO APRIL 17 @ 12:30 PM:  PUBLIC HEARING NOI SE 12 – 839; REID SILVA FOR KEVIN AND ELIZABETH OLIVER; 139 Tea Lane; Map 3 Lot 1 (Trina’s property):  Redevelop an existing lot.  A pre-existing, 3-bedroom 788 sq. ft. house located within a wetland will be removed and the area restored.  An existing 375 sq. ft. studio located within the 100-foot buffer zones of a wetland and man-made pond will be removed.  An existing 1,400 sq. ft. driveway located in a buffer zone and a wetland will be abandoned and re-vegetated.  A total of 2,563 sq. ft. of structure and driveway will be removed from the wetland and wetland buffer zone.  A new 3-bedroom house, garage and sunroom with a 1,600 sq. ft. footprint are proposed and located within the 100-foot buffer zones of the wetland and pond.  The closest sections of this structure are 13 feet from the wetland edge and 50 feet from the pond.  A new well and a high-capacity infiltrator bed septic system are also proposed.  The well is in the buffer zone and 14 feet from the wetland edge.  The leach field is in the buffer zone and 53 feet from the wetland edge.  
  • CERTIFICATE OF COMPLIANCE AMENDED SE 12- 481; CHILMARK POND ASSOCIATION; Phragmites control; AP 24 - 129, 130, 205, 206, 211, 213, 224;                         AP 28-11:  An amended Order was issued in 2007 to control Phargmites inChilmark Pond.  The request expressly declares the work complete with no further work or maintenance required.  It subsequently requests the elimination of Special Condition # 20 that provides for on-going maintenance with conditional compliance measures.
  • DISCUSSION AMENDED SE 12 – 760; CESTAR; AP 32-40:  A Certificate of Compliance was issued in October 2018 with the on-going condition prohibiting the use of fertilizers, pesticides or fungicides.  A site visit on March 26, 2019 indicated significant additional clearing and the addition of a stone retaining wall took place after issuing the Certificate.  A significant amount of this work is within a Bordering Vegetated Wetland draining into Stonewall Pond, the 100-foot buffer zones of Stonewall Pond, the wetland draining into Stonewall Pond and a perrenial stream draining into Stonewall Pond.       
  • ADMINISTRATION:
Meeting Minutes: 3/20/19.

Signatures:
        Order of Conditions Oliver; SE 12 – 839; AP 3-1 (if voted).
        Certificate of Compliance Amended SE 12 – 481; Chilmark Pond Association (if voted).

  • NEXT MEETING:  Next Meeting April 17, 2019 @ 12:30 PM.