CONSERVATION COMMISSION AGENDA 6/20/18 @ 12:30 PM
Site Visit Day of Meeting 12:00 Noon
- 12:30 PM: PUBLIC HEARING NOI SE 12 – 815 REID SILVA FOR ROBERT SCHIFF; 20 David’s Way; AP 21-21.1, 21.2: Remove an existing brick patio and build a screened porch addition with a four-foot frost wall foundation with a slab-on-grade floor. The project is within the 100-foot buffer zone of the top of a Coastal Bank on Vineyard Sound. The closest portion of the excavation work is approximately 75 feet from the top of the bank.
- CERTIFICATE OF COMPLIANCE SE 12 – 784; OLS MVY, LLC; 11 Flanders Lane; AP 27.1-204: An Order was issued in February 2017 to demolish an existing house, build a new house within the same footprint of the original structure and install a new well. The project was within the 100-foot buffer zone of a Bordering Vegetated Wetland and eventually draining into Menemsha Pond. Recommend the project is in complete compliance with the Order.
- CERTIFICATE OF COMPLIANCE SE 12 – 794; OLS MVY, LLC; 11 Flanders Lane; AP 27.1-204: An Order was issued in September 2017 to bury the utility lines within the road layout of Flanders Lane. A portion of the directional drilling trench went underneath a perennial stream that is channeled through a culvert under Flanders Lane. Recommend the project is in complete compliance.
- ADMINISTRATION:
Meeting Minutes: 5/16/18; 6/6/18.
Discuss new meeting dates and times.
Signatures:
Order of Conditions SE 12 – 815; Schiff; AP 24-1 (if voted).
Certificate of Compliance SE 12 – 784; OLS MVY, LLC; AP 27.1-204 (if voted).
Certificate of Compliance SE 12 – 794; OLS MVY, LLC; AP 27.1-204 (if voted).
- NEXT MEETING: Next Meeting July 18, 2018 @ 12:30 PM.
|