CONSERVATION COMMISSION AGENDA 11/01/17 @ 12:30 PM
Site Visit 11/01 @ 12:00 NOON
- 12:30 PM: PUBLIC HEARING SE 12 – 803; SEAN RILEY FOR MICHAEL ANDREWS; US COAST GUARD CIVIL ENGINEERING; 20 Edy’s Island Way; AP 27.1-78: Replace the existing failing wastewater treatment facility that currently discharges into Green Pond. The new system will include a grease trap for galley waste located in the upper parking area; a septic tank for sanitary waste from the Barracks and Operations buildings and a Perc-Rite Drip Dispersal System for soil absorption. The project is within the 100-foot buffer zones of a Bordering Vegetated Wetland for Green Pond and a Coastal Bank for Green Pond that is not a sediment source. The closest activity
is 55 feet from the wetland edge and 15 feet from the bank.
- POSSIBLE FOLLOW UP SE 12 – 797; REID SILVA FOR 2 SISTERS RLTY. TRUST; 35 Harlock Pond Rd.; AP 1-12: Review revised site plan with the final buried utilities trench location.
- ADMINISTRATION:
Meeting Minutes: 10/18/17.
Signatures:
Order of Conditions USCG; SE 12 - 803; AP 27.1-78 (if voted).
- NEXT MEETING: Next Meeting November 15 @ 12:30 PM:
Site walk to see the walkway in the Menemsha salt marsh
|