Skip Navigation
Click to return to website
This table is used for column layout.
Conservation Commission Agenda 09/21/16
CONSERVATION COMMISSION AGENDA 9/21/16 @ 12:30 PM
No Site Visits Needed


  • FOLLOW UP DISCUSSION JIMMY MORGAN FOR CHIP PHILLIPS; LARSEN LANE LLC; 19 Larsen Lane; AP 27.1-57:  You reviewed an RFD in February 2016 to do the following: Brush cut the rear property to the lot lines; remove dead trees and vines and spread seed.  The root structure for the brush will remain intact as no tilling will be done.  The closest activity is approximately 15 feet from the wetland edge.  You asked Jimmy to have the wetlands delineated and return with the site plan.  Doug Cooper did the delineation.
  • CERTIFICATE OF COMPLIANCE SE 12 – 766; REID SILVA FOR CHLOECO HOLDINGS; 20 David’s Way; AP 21-21.1, 22:  An Order was issued in April 2016 to stabilize an eroding coastal bank on Vineyard Sound by planting American Beach grass one foot apart on the coastal bank.  Approximately 160 linear feet of bank will be planted.  Recommend the project is in full compliance with the on-going condition that any maintenance plans shall be reviewed by the Commission or its designee before the maintenance work begins.
  • CERTIFICATE OF COMPLIANCE SE 12 – 223; JILL A. GOODMAN, TRUSTEE;                     72 Cobbs Hill Rd.; AP 11-25.1:  An Order was issued in 1994 to build a ramp and two seasonal float docks.  The property is being sold and a Certificate of Compliance has been requested.  Recommend the project is in full compliance with the on-going conditions #  17, 18:  the ramp and float dock shall be removed by hand and stored on top of the fixed deck by November 1 of each year and installed no sooner than April 15 each spring.  Floats are to be cleaned only with water and no anti-fouling paint shall be used on any part of the structure.
  • CERTIFICATE OF COMPLIANCE AMENDED SE 12 – 749; REID SILVA FOR SCHEUER FAMILY PROPERTIES; 2 Chocker’s Lane; AP 34-4.2:  A partial Certificate was issued to remove AP 33-5 from the scope of work.  This Certificate is for the amended walking path and beach stairway to Menemsha Pond that was cleared and built on AP 34-4.2.  Recommend the project is in full compliance with the on-going condition any stairway maintenance plans must be reviewed by the Commission or its designee before work begins.
  • ADMINISTRATION:
        
Meeting Minutes: 8/17/16.

        Signatures:

Determination of Applicability Phillips; AP 27.1-57 (if voted).
Certificate of Compliance SE 12 – 766; Chloeco Holdings; AP 21-21.1, 22 (if voted).
Certificate of Compliance SE 12 – 223; Goodman; AP 21-21.1, 22 (if voted).
Certificate of Compliance Amended SE 12 – 749 Scheuer; AP 34-4.2 (if voted).

                    
  • NEXT MEETING:           Wed., October 5 @ 12:30 PM.