Conservation Commission Agenda 03/16/16
CONSERVATION COMMISSION AGENDA 3/16/16 @ 12:30 PM
Site Visits Ides of March @ 12:30 PM


  • NOI SE 12 – 763; REID SILVA FOR THE ESTATE OF GERTRUDE W.             12:30 PM
TAYLOR; 21 Eliot Ave.; Map 33 Lots 26, 27, 28:  Construct a basement foundation under an existing dwelling that is located in the buffer zone of a wetland draining into a coastal pond and the Atlantic Ocean.  The plantings around the house will be removed; the house will be raised and disconnected from all services.  The excavation spoils will be removed from the site daily.  The closest activity is approximately 30 feet from the wetland edge.  

  • NOI SE 12 - ???; REID SILVA FOR PAUL SLAVIN AND SUSAN           12:40 PM
WAITZKIN; 6 Eddy Farm Rd.; AP 25-1.2:  Demolish the existing house and build a new dwelling, terrace and patio.  A new basement foundation will be excavated and poured; the electric, cable and septic system infrastructure will be re-routed and connected to the new house.  The southeast side of the house and foundation is located within the 100-foot buffer zone of a Bordering Vegetated Wetland.  The closest activity and limit of work is approximately 80 feet from the wetland edge.

  • CONTINUED PUBLIC HEARING NOI – LOCAL BYLAW ONLY;              12:50 PM
NO DEP FILE #; TARA MARDEN FOR FOOL’S HIGH TIDE, LLC; 25 East Lane; AP 32-68.1:    (Eligible voters: Sandy, Candy, Pam, Joan, Chris, Russell and Bob) Review questions and answers.  This is a submission of the plan for the DEP’s Superseding Order of Conditions to protect the existing single-family residence that is approximately 82 feet from the top of the coastal bank.  The proposal is intended to be a storm buffer to the coastal bank.  It adds 1600 cubic yards of cobble to construct a berm above mean high water and an additional 650 cubic yards of sand on top of the cobble.  The berm will run the entire length of the property (415 linear feet). The total project area is 17,450 sq. ft.

  • CERTIFICATE OF COMPLIANCE SE 12 – 422; MALCOLM WALSH AND KATHLEEN O’HARA; 25 Peases Point Way; AP 27-19:  An Order was issued in February 2002 to excavate, construct, grade and install a crushed stone driveway and part of a fieldstone wall.  Approximately    2,600 sq. ft. of buffer zone were disturbed.
  • DISCUSSION SE 12 – 748; REID SILVA FOR JACK TAYLOR; 21 Squibnocket Rd.; AP 35-24:  An Order was issued in October 2015 to construct a 4-foot wide field grass walking path through a wetland buffer with an elevated walkway over the wetland, remove a well house and install a kayak storage rack.  Reid would like to propose a new location for the path.  Determine if the change is inconsequential or, requires the hearing to be re-opened.
  • ADMINISTRATION:
                Meeting Minutes 3/2/16.

Signatures:

Order of Conditions Local Bylaw Only; Fool’s High Tide; AP 32-68.1 (if voted).
Order of Conditions SE 12 – 763; Taylor; AP 33-26, 27, 28 (if voted).
Order of Conditions SE 12 - ???; Slavin, Waitzkin; AP 25-1.2 (if voted).
                Certificate of Compliance SE 12 – 422; Walsh, O’Hara; AP 27-19 (if voted).
        





        
  • NEXT MEETING:           Wed., April 6 @ 12:30 PM
Site Visits: April 5 @ 12:30 PM

NOI Reid Silva for Chloeco Holdings, Ltd.; 20 David’s Way; AP 21-21.1, 22:  Stabilize an eroding coastal bank on Vineyard Sound by planting American Beachgrass one foot apart on the coastal bank.  Approximately 160 linear feet of bank will be planted.  

Possible NOI Reid Silva and Peter Rodegast for Jack Taylor; 21 Squibnocket Rd.; AP 35-24 (Vytlacil House):  Renovate and expand the existing house.