Skip Navigation
Click to return to website
This table is used for column layout.
Conservation Commission Agenda 12/16/15
CONSERVATION COMMISSION AGENDA 12/16/15 @ 12:30 PM
No Site Visits Needed

  • PUBLIC MEETING RFD KRISTEN FAUTEUX – SHERIFF’S MEADOW       12:30 PM
FOUNDATION; Wades Field @ Wades Field Lane and Whiting Way; AP 23-5:  The applicant would like to lease approximately 4.9-acres of land in Wades Field to Morning Glory Farm.  The land will be used to grow hay for cattle.  The area will be plowed and treated with lime and other nutrients according to the soil tests.  A mixture of grasses, alfalfa and clover will be planted and harvested.  The 4.9-acres abuts the 100-foot buffer zone of a wetland bordering Gilbert’s Cove.
  • CERTIFICATE OF COMPLIANCE SE 12 – 204; Fairlawn Ltd. Partnership; 6 Eddy Farm Rd.; AP 25-1.2:  This Order was issued in August 1994 for the development of this lot with a house, garage, driveway, utilities and septic.  Portions of the driveway, parking area house and lawn are within the 100-foot buffer zone of a Bordering Vegetated Wetland.  The closest activity was 75 feet from the wetland edge.
  • CERTIFICATE OF COMPLIANCE SE 12 – 715; MARIN STREET; 1 Crowberry Lane;             AP 14-19.5:  This Order was issued in October 2014 to install a duplicate set of buried utility lines in an existing right of way and roadway that already has a set of buried utility lines feeding another lot.  The roadway and trench goes through a Bordering Vegetated Wetland.  Approximately 200 sq. ft. of the roadway within the wetland will be temporarily disturbed for the trench.  Note:  Subsequent to issuing the Order the applicant decided to use boring technology in lieu of trenching because it was easier and less disturbing.  
  • FOLLOW UP DISCUSSION SE 12 – 752; REID SILVA FOR YOU DIRTY RAT, LLC; 227 North Road; AP 14-9:  Reid would like to present the following for the bridge reconstruction and road maintenance as outlined in condition # 2:  Before work begins the applicant shall return to the Commission with a detailed plan for managing road surface water runoff at least 100 feet on both sides of the bridge.  A combination of water bars, specific roadway surface material and a roadway sides drainage system and material shall be considered.  A construction erosion control system shall also be presented.
  • ADMINISTRATION:
                Meeting Minutes 11/18/15, 12/2/15.
                
Signatures:
Determination of Applicability Fauteux; AP 23-5 (if voted).
                Certificate of Compliance SE 12 – 204; Fairlawn Ltd. Partnership; AP25-1.2 (if voted).
                Certificate of Compliance SE 12 – 715; Street; AP 14-19.5 (if voted).

  • NEXT MEETINGS:  Wed., January 6, 2016 @ 12:30 PM
Wed., January 20, 2016 @ 12:30 PM
Wed., February 3, 2016 @ 12:30 PM
Wed., February 17, 2016 @ 12:30 PM