Skip Navigation
Click to return to website
This table is used for column layout.
Conservation Commission Agenda 12/02/15
CONSERVATION COMMISSION AGENDA 12/2/15 @ 12:30 PM
Site Visits 12/1/15 @ 12:30 PM

  • PUBLIC MEETING RFD CHRIS ALLEY FOR MARC VILLA; 11 Howell Lane;  12:30 PM
AP 27-4.1:  Construct a built-in swimming pool.  The pool is outside the 100-foot buffer zone of a Bordering Vegetated Wetland.  A portion of the four-foot high pool enclosure is within the wetland buffer zone – approximately 85 feet from the wetland edge.  The pool and pool equipment shed are located within the second 100-feet of the Riverfront Zone.  

  • PUBLIC HEARING NOI SE 12 - ???; REID SILVA FOR SQUIBNOCKET              12:35 PM             ASSOCIATES, LTD.; off Squibnocket Farm Rd.; AP 37-2:  Repair and maintain a drainage culvert under Squibnocket Farm Road and stabilize an intermittent drainage way with cobble bedding stone. The culvert work is 15 feet from the edge of the wetland and drainage way to the northwest and the proposed cobble will be placed in the drainage way south down the Coastal Bank to the Atlantic Ocean.
  • PUBLIC HEARING NOI SE 12 - ???; REID SILVA FOR RUSSELL MALONEY  12:45 PM
245 North Road; AP 13-8:  Convert an existing one-story barn that is adjacent to a pool into a two-bedroom dwelling by changing the interior layout and expanding the structure over an existing deck supported by a sonotube foundation.  The dwelling will be connected to the existing septic system and already has water service.  The project is in the 100-foot buffer zone of a Bordering Vegetated Wetland and a fresh water pond.  The closest activity is approximately 75 feet from the pond and 70 feet from the wetland edge.

  • PUBLIC HEARING NOI SE 12 - ???; CHRIS ALLEY FOR DAVID FRIEDBERG;        12:55 PM
1 Azalea Lane; Map 29 Lot 5:  Upgrade the existing 5-bedroom septic system by replacing the septic tank and pump chambers and plumbing.  The existing apparatus and plumbing will be removed.  The activity is 3 feet from the edge of a Bordering Vegetated Wetland.  The applicant would also like to build and maintain a seasonal timber beach stairway down the Atlantic Ocean coastal bank.   

  • ADMINISTRATION:
                Meeting Minutes 11/18/15 (if available).
                
Signatures:
Determination of Applicability Villa; AP 27-4.1 (if voted).
Order of Conditions Squib. Assoc., LTD.; AP 37-2 (if voted).
Order of Conditions Maloney; AP 13-8 (if voted).
Order of Conditions Friedberg; AP 29-5 (if voted).

  • NEXT MEETINGS:          Wed., December 16, 2015 @ 12:30 PM;  
Wed., January   6, 2016 @ 12:30 PM

Wed., January 20, 2016 @ 12:30 PM

Wed., February 3, 2016 @ 12:30 PM

Wed., February 17, 2016 @ 12:30 PM