Conservation Commission Agenda 09/16/15
CONSERVATION COMMISSION AGENDA 9/16/15 @ 12:30 PM
Site Visits:  9/15/15 @ 12:30 PM
  • PUBLIC HEARING NOI SE 12 – ???; REID SILVA FOR JEROME P.              12:30 PM
& CAROL B. KENNEY; 45 Beach Rd.; AP 2-3:  Lift an existing studio/workshop, excavate and construct a concrete crawl-space foundation beneath the building.  The building will be re-set on top of the foundation.  The project is in a 100-foot wetland buffer zone.  The closest excavation activity is approximately 72 feet from the wetland edge.  

  • PUBLIC HEARING NOI SE 12 - ???; REID SILVA FOR FRANK V. SICA;   12:40 PM
16 Crick Hill Rd.; AP 27.1-121:  Perform stabilization work on approximately 55 linear feet of Menemsha Basin coastal bank.  The damage was caused by the late-June storm.  The following work is proposed:  stabilize the existing boulder on the coastal bank; install a granite curb along Crick Hill Road to control water runoff; remove invasive oriental bittersweet vines and plant native vegetation to stabilize the bank.
  • PUBLIC MEETING RFD CHRIS ALLEY FOR KAY MATSCHULATT;     12:45 PM
34 Flanders Lane; AP 26-28:  Install a new water well in one of two possible locations.  The final location will be determined by the Board of Health.  Both possible locations are within the 100-foot buffer zone of a Bordering Vegetated Wetland.  The closest location is approximately 48 feet from the wetland edge.

  • CERTIFICATE OF COMPLIANCE SE 12 – 413; BARBARA CROSBY; 3 Nickerson Farm Lane; AP 21-48.2:  An Order was issued in 2001 for surface and subsurface drainage systems; renovating an existing screen porch and stone terraces; add a new stone terrace and retaining wall, driveway and parking area; renovate the lawn and add plantings.  Approximately 17,500 sq. ft. of buffer zone was impacted.
  • CERTIFICATE OF COMPLIANCE (NO DEP FILE # - LOCAL BYLAW JURISDICTION
ONLY); RICHARD KAUFFMAN; 20 Chappaquoit Rd.; AP 24-211:  An Order was issued in July
2013 to replace two existing dwellings with two new dwellings.  A portion of one of the two
structures will be located within the 100-foot buffer zone of the 100-year flood zone of Chilmark Pond
which is within the jurisdiction of the Town’s Wetland Protection Bylaws.  The area is also within the jurisdiction of the NHESP.  The outside limit of work is 95 feet from the 100-year flood zone boundary—and 195 feet from the wetland edge.  A subsequent landscape plan was approved in September 2013.

  • DISCUSSION SE 12 – 727; REID SILVA FOR BRIAN R. KENNEY; 26 Harbor Hill Rd.;            AP 27.1-107:  An Order was issued for the lot’s below ground infrastructure, retaining walls, parking and re-landscaping in January 2015.  The architect would like to propose changes to the approved landscape plan.  The Commission needs to determine if the changes are inconsequential or require the hearing to be re-opened.
  • ADMINISTRATION:
                Meeting Minutes 8/19/15.
Signatures:
Order of Conditions SE 12 – ???; Kenney; AP 2-3 (if voted).
                Order of Conditions SE 12 - ???; Sica; AP 27.1-121 (if voted).
                Determination of Applicability Matschulatt; AP 26-28 (if voted).
                Certificate of Compliance SE 12 – 413; Crosby; AP 21-48.2 (if voted).
                Certificate of Compliance No DEP file #; Kauffman; AP 24-211 (if voted).

  • NEXT MEETING:   Wed., October 7, 2015 @ 12:30 PM.