Conservation Commission Agenda 08/06/14
CONSERVATION COMMISSION AGENDA 8/6/14 @ 12:30 PM
Site Visits 8/5/14 @ 12:30 PM


1.   NOI SE 12 – 709; REID SILVA FOR EILEEN MAYHEW, TRUSTEE;  12:30 PM
3 Clam Point Cove Road; AP 33-121:  Construct and maintain a 3-foot wide brush cut and mowed access path and stairway down the coastal bank to the shoreline of Nashaquitsa Pond.  The activity is in the 100-foot buffer zone and the resource area of a coastal bank.

     2.   NOI SE 12 - ???; CHRIS ALLEY AND JOHN ABRAMS FOR                     12:40 PM
I FOUND MY THRILL, LLC; 74 North Rd.; AP 3-2:  Obtain an Oder of Conditions for a shed that was constructed within the 100-foot buffer zone of a Bordering Vegetated Wetland without a permit.  The shed is approximately 58 feet from the wetland edge.

3.  NOI SE 12 – 711; REID SILVA FOR BRIAN KENNEY, TRUSTEE;            12:45 PM
26 Harbor Hill Rd.; AP 27.1-107:  Construct and maintain two decks, excavate and repair the foundation, remove a porch and build a new 5’ X 8’ porch, add an outdoor shower, remove and replace two retaining walls with two dry-laid fieldstone retaining walls and add a second-story addition onto the existing house.  The work is in the 100-foot buffer zone of a coastal bank.  The closest activity is approximately two feet from the top of the bank.

      4.  ADMINISTRATION:   
                Minutes 7/16/14; 7/23/14.
                
Signatures:
                Order of Conditions SE 12 – 709; Mayhew; AP 33-121 (if voted).
Order of Conditions SE 12 – 711; Kenney; AP 27.1-107 (if voted).
Order of Conditions SE 12 - ???; I Found My Thrill, LLC, AP3-2 (if voted).

Discuss Town’s Committee on Squibnocket request.
                
  • NEXT MEETING:  Wed., August 20, 2014 @ 12:30 PM; Site Visits August 19 @ 12:30 PM.
RFD REID SILVA FOR STEVEN YAFFE AND THE LORNA T. FLANDERS REVOCABLE TRUST; AP 13-27.1: Clear a driveway that is in the buffer zones of two isolated wetlands; drill a water well that is in the buffer zone of an isolated wetland and a Bordering Vegetated Wetland; bury utilities down the existing dirt road portions of which are within the buffer zone of an isolated wetland and a Bordering Vegetated Wetland and construct a barn and a separate greenhouse that are both located within the buffer zone of two separate isolated wetlands.