CONSERVATION COMMISSION AGENDA 5/7/14 @ 12:30 PM
Site Visits 5/6/14 @ 12:30 PM
- PUBLIC MEETING RFD GARY STUBER FOR JACI JUDELSEN; 12:30 PM
15 Cove Road; AP 27.1-206: Construct a 184 sq. ft. addition to an existing deck. The framing will be approximately 30 inches above grade. The addition will be supported by four non-concrete “Ready Footings”. The footings will be approximately four feet below grade. The framing will be pressure-treated wood and the deck surface will be recycled fir. The closest point is approximately 30 feet from the wetland edge.
2. PUBLIC MEETING RFD; REID SILVA FOR MARY ANN HOXSIE 12:40 PM
14 Marjo’s Way; AP 27-2: Abandon and fill the existing cesspool and install and maintain an upgraded septic system. The cesspool and new system are within the 100-foot buffer zone of a Bordering Vegetated Wetland. The closest point is approximately 49 feet from the wetland edge. The work will be done on the property located at 14 Marjo’s Way; Assessors’ Map 27 Lot 2.
3. ADMINISTRATION:
Minutes 4/16/14.
Signatures:
Determination of Applicability Judelsen; AP 27.1-206 (if voted).
Determination of Applicability Hoxsie; AP 27-2 (if voted).
- NEXT MEETING: Wed., May 21, 2014 @ 12:30 PM; Site Visits May 20 @ 12:30 PM
Amended NOI and Order of Conditions; SE 12 – 694; Chris Alley for Doug Liman; 34 Blacksmith Valley Rd.; AP 35-38: Review a proposed change to the approved barn size and rotate the barn’s position.
NOI Reid Silva for Frank Sica; 20 Crick Hill Rd.; AP 27.1-219: Tear down and remove the existing house and foundation. Re-vegetate the site and create a small parking area. This is Jerome Kenny’s house that was purchased by Mr. Sica who does not want to build a new house on the property.
NOI Chris Alley and Geoff White for Wendy Wolf; 38 Flanders Lane; AP 26-27: Construct an addition and accessible ramp to a single-family dwelling in the buffer zone of a Bordering Vegetated Wetland.
RFD George Sourati for SWB Limited Partnership; 8 Greenhouse Lane; AP 33-30: Install a buried sewer pipe from the house to the septic tank. The activity is in the 100-foot buffer zone of a coastal bank.
|