CONSERVATION COMMISSION AGENDA 10/3/12 @ 12:30 PM
Site Visits took place on October 2@ 12:30 PM.
- PUBLIC MEETING RFD GILBERT WILCOX; 14 Harbor Hill Rd.; 12:30 PM
Map 27.1 Lot 103: Build a 2’ X 4’ addition to the bathroom on the east side of the house. The addition will be suspended over the coastal bank and buffer zone on the existing pilings and support beams. A small section of existing deck will be removed for the addition. There will be no disturbances to the coastal bank or buffer zone.
- PUBLIC HEARING NOI SE 12 - 668; GEORGE SOURATI FOR SWB 12:40 PM
LIMITED PARTNERSHIP; 8 Greenhouse Lane; Map 33 Lot 30: Renovate and build an addition to the main residence and relocate part of the existing driveway. The addition consists of 80 sq. ft. of living space for a mud room; 109 sq. ft. of covered porch and 166 sq. ft. of wooden decks. The activity takes place within the 100-foot buffer zone of the Atlantic Ocean Coastal Bank and within the 200-foot Riverfront Zone. The closest activity is within four feet of the top of the Coastal Bank.
3. DISCUSSION REID SILVA FOR SHEPHERD’S PATH NOMINEE TRUST; SE 12 – 545; 16 Shepherd’s Path; Map 24 Lot 1: Discuss the proposed maintenance plan for continued Phragmites control. Order issued to Isabelle Scott in 2007. Wayne Arruda did the original work.
4. ADMINISTRATION:
Minutes 9/19/12.
Would it be okay to schedule the Nov. 7 meeting for Nov. 14? This will be the only meeting in November because the Nov. 21 meeting will not take place -- Thanksgiving is Nov. 22.
Signatures:
Determination of Applicability Wilcox; AP 27.1- 103 (if voted).
Order of Conditions SWB Limited Partnership; SE 12 – 668; AP 33-30 (if voted).
- NEXT MEETING: Wed., October 17 @ 12:30 PM. Site Visits will take place on October 16.
Notice of Intent filed by Chris Alley of Schofield, Barbini & Hoehn for Stephen Merkel and Robin Shanus. The applicant would like to build an indoor squash court with a half bath, water, electric and heating service. The building will be located in the second 100-foot section of the Riverfront Zone. There will be some construction disturbance within the 100-foot buffer zone of a Bordering Vegetated Wetland for the foundation work. The project will be done on the property located at 17 Howell Lane; Assessors’ Map 27 Lot 3.
|