Skip Navigation
Click to return to website
This table is used for column layout.
Conservation Commission Agenda 03/21/2012
CONSERVATION COMMISSION AGENDA 3/21/12 @ 12:30 PM
Site Visits will take place on March 20 @ 12:30 PM.


1.  NOI SE 12 -649; MATT FLANDERS FOR BLUE SKY, MV; 40 Cobbs Hill Rd.;  12:30 PM
   AP 11-23.3:  Remove several pitch pine saplings (less than 6” diameter) and understory growth to create an open space for re-vegetation and perpetual maintenance.  The tree stumps will be left in place and all work will be done by hand.  An existing wooden fence enclosure will be expanded to screen pool equipment.  Evergreen vines and several varieties of Rhododendron will be planted in the cleared area.  The disturbed area will be covered with aged wood chip mulch.  New plants will be inoculated with mycorrhizae to aid in root establishment.  A temporary drip irrigation system will be installed for the first three years of growth.   The activity will take place in the 100-foot buffer zone of the Wades Cove Coastal Bank.

2.  RFD MATT DIX FOR MV LAND BANK; off Tea Lane; AP 12-4.1, 38.2:               12:40 PM                                  
Construct a 1000 sq. ft., 3-car trailhead off Tea Lane in the buffer zone of a Bordering Vegetated Wetland.  The  parking area will be 50 feet from the wetland edge.  In addition, an existing bar-way will be relocated to an upland location.  This will greatly reduce the impact on a wetland.  A proposed 200 ft. connector trail is proposed and run along the the field edge.   The trail is in the buffer zone of a Bordering Vegetated Wetland.  The closest section of the connector trail will be 10 feet from the wetland edge.

3. FOLLOW UP DISCUSSION CARLOS MONTOYA FOR SWB PARTNERSHIP;                8 Greenhouse Lane; AP 33-30:  (Deter. of App.) Review site and landscape plans for blue stem meadow; (Enforcement Order) Review plan to remove stone wall and re-vegetate buffer zone.
4.  DISCUSSION TOM DELLA ROCCO FOR ROCKEFELLER; SE 12 – 536; 6 Greenhouse Lane; AP 33-31:  Review maintenance plan for approved coastal bank stabilization plan as specified in Order of Conditions.

5.  DISCUSSION JOSH KOCHIN OF LANDSCOPE FOR ADAM ZOIA; SE 12 – 604;          18 Point Inner Way; AP 33-114:  Discuss proposed relocation of A/C condensers and placing them in a buried concrete bunker/vault in the buffer zone of the fresh water pond.  Review landscape proposal and changes to the approved plan from 2 years ago.

6.  ADMINISTRATION:
Minutes 3/7/12.
Signatures:
Order of Conditions SE 12 - 649; Blue Sky MV; AP 11-23.3 (if voted).
Determination of Applicability Land Bank; AP 12-4.1, 38.2 (if voted).

7.  NEXT MEETING:  April 4, 2012:  Site Visits April 3 @ 12:30.

1.  RFD John Keene for Paul Mayhew:  Replace driveway drainage culvert along Menemsha Crossroad in buffer zone.
2.  Continued NOI DiMaura:  Basin Rd.; Menemsha:  House expansion in buffer zone.  
3.  Continued NOI Bluff House Dynasty; 78 Squibnocket Ridge; House expansion in buffer zone.
4.  NOI Russell Smith; 26 Harbor Hill Rd.:  Repair Donald Smith’s septic system in coastal bank buffer zone.
5.  NOI Chris Alley for Richard Lochridge: 2 Stone Ridge:  Build a detached bedroom in a buffer zone.