CONSERVATION COMMISSION AGENDA 9/21/11 @ 12:30 PM
Site Visits were made on 9/20.
- PUBLIC HEARING NOI SE 12 – 638; GEORGE SOURATI FOR 12:30 PM
DAN AND TARA GOLEMAN; 15 Hammett Rd.; AP 8-50.1: Install a six-foot wide horse path through an isolated wetland and install a buried utility line under the proposed horse path through the wetland.
- CARLOS MONTOYA FOR ENFORCEMNET ORDER – 8 GREENHOUSE LANE; AP 33-30: Review plan that responds to the Enforcement Order requirements: 1. Provide a field mowing plan that establishes a no-cut buffer along the stream’s edges. 2. Provide a restoration plan of native vegetation that re-establishes a no-cut buffer from the top of the coastal bank. 3. Provide a care and maintenance plan (specify any organic or other fertilizers if any) for the newly planted lawn outside the no cut buffer.
- FOUR CERTIFICATES OF COMPLIANCE FOR 9 AZALEA NOMINEE TRUST (Belushi):
- Amended SE 12 – 531: Original plan to relocate dwellings.
- SE 12 – 589: Reduce the amount of decking by 653 sq. ft. and add 631 sq. ft. of habitable living space in the buffer zone; add a limit of mowing to the plan.
- SE 12 – 615: Beach stairway.
- SE 12 – 622: New water line a portion of which went through a wetland.
4. ADMINISTRATION:
Bruce Bartels Memorial Service West Tisbury Church: Saturday, September 24 @ 1:00 PM Memorial Reception at the Grange Hall immediately following the service.
Minutes 9/7/11.
Signatures:
Order of Conditions Goleman; SE 12 – 638; AP 8-50.1 (if voted).
Cert. of Compliance Amended SE 12 – 531: Original plan to relocate dwellings (if voted).
Cert. of Compliance SE 12 – 589: Reduce the amount of decking by 653 sq. ft. and add 631 sq. ft. of habitable living space in the buffer zone; add a limit of mowing to the plan (if voted).
Cert. of Compliance SE 12 – 615: Beach stairway (if voted).
Cert. of Compliance SE 12 – 622: New water line a portion of which went through a wetland (if voted).
- NEXT MEETING: October 5; Site Visits October 4 @ 12:30 PM
|